5/30/2023 0 Comments Supersync serial number![]() They went to the CETA carts on the truss, and took them to the P3 truss segment where two small and two large thermal covers were removed and stuffed into bags. Suni Williams emerged at 1332 UTC with LA exiting the lock at 1340 UTC. On Feb 8 at 1322 UTC Quest was again depressurized, with hatch open at 1324 UTC. The airlock was repressurized at 2049 UTC. The astronauts returned to the airlock at 2025 UTC and closed the hatch at 2033 UTC. ![]() The spacewalkers completed reconfiguration of the ammonia cooling system, retracted the aft radiator on the P6 truss, and began installation of cables that will allow a docked Shuttle to get electrical power from the ISS solar arrays. The Quest airlock was depressurized and the hatch opened at 1336 UTC. LA and Williams began another EVA on Feb 4. Lopez-Alegria, Williams and Tyurin continue on ISS as Expedition 14.
0 Comments
Leave a Reply. |